Renovations continuing at university dorms
Director of KFU鈥檚 Student City Radik Nikolaev speaks about the works.
Currently, dorms N 10 and N 6 are being refurbished.
鈥淎t the 10th dormitory, which currently hosts 363 people, kitchens, restrooms, and hallways will be renovated. This includes all doors, floors, and ceilings,鈥 says Nikolaev.
Work is in full swing at the 6th dormitory as well. Here, water pipes and restrooms will be renovated.
Everything should be finished before September 鈥 the start of the new academic year.